Second National Urban Water Sector Reform Project in Nigeria: Consultancy Services for Engineering Supervision of Rehabilitation of Water Treatment Plant at Adiyan

Project Summary

The Lagos State Government of Nigeria has received financing from the International
Development Association through the Federal Government of Nigeria toward the cost of the
Second National Urban Water Sector Reform Project and intends to apply part of the proceeds for Consultancy Services for Engineering Supervision of Rehabilitation of Water Treatment Plant at Adiyan.

Scope of Services

The service is for engineering supervision of rehabilitation of Water Treatment Plant at Adiyan. It is estimated that a maximum of 12-15 months of consulting services inputs will be required for the following:

1.0 Project Planning& Co-ordination involving finalizing project schedules, review of contract documentation, coordination, meeting and activities ensuring adherence to project programme.
1.2 Construction Supervision involving fitness tests for existing mechanical, electrical equipment, quality planning and assurance, review, monitoring and approval of contractor’s schedules, methods, work plans, site activities etc.

1.3 Review and approve quality control plans and documents as well as witness materials testing and ensure general adherence to specifications and standards

1.4 Progress Reporting on daily, weekly and monthly on overall project activities detailing progress of work, challenges, safety and environmental issues etc.

1.5 Safety Management implementation, approval and monitoring including regular safety inspections, safety review meetings and recommendations etc.

1.6 Contractor’s bill certification involving measurement of actual work done, certification of contractor invoices for payment, assistance in fixing rates where applicable, manage variations and extra items.

1.7 Assistance in commissioning and Start-up Services involving review and approval of operation & maintenance manuals, witness commissioning/performance tests, assist in taking over of completed facility etc
1.8 Completion of Snag lists and rectification of defects during the defect liability period.

1.9 Issuance of taking over final certificate and hand over the structure to Client.

1.10 Ensuring that contractors prepare As-Built Drawings of the entire project in accordance with the terms of the specifications